Original article by Glen Norris
The Australian – Page: 16 : 18-Oct-23
Rio Tinto has advised that its Pilbara iron ore shipments for the September quarter totalled 83.9 million tonnes, which is one per cent higher year-on-year. However, iron ore production was down one per cent at 83.5 million tonnes. Rio Tinto expects its iron ore shipments for calendar 2023 to be at the upper end of its initial full-year guidance of 320 to 335 million tonnes. Meanwhile, Rio Tinto’s aluminium and bauxite production rose by nine per cent and two per cent respectively year-on-year.
CORPORATES
RIO TINTO LIMITED – ASX RIO