Real and growing threat to grid if Australia goes for nuclear power

Original article by Peter Hannam
The Guardian Australia – Page: Online : 26-Jun-24

The Australian Energy Market Operator has concluded that the rollout of wind and solar power needs to be accelerated as part of the energy transition. The latest edition of AEMO’s Integrated System Plan warns that there is a "real and growing" risk that replacement generation will not be available when coal-fired power stations are shut down, which underlines the need for increased investment in renewables. AEMO has also cautioned that nuclear plants could not be built and powered up before coal exits the energy grid.

CORPORATES
AUSTRALIAN ENERGY MARKET OPERATOR LIMITED

Leave a comment