Original article by Angela Macdonald-Smith
The Australian Financial Review – Page: 26 : 27-Nov-20
The Australian Energy Market Operator has released its ‘summer readiness’ plan for the power market. AEMO has contracted over 1,900 megawatts of extra emergency power generating capacity for the 2020-21 summer peak, although heatwave and bushfire conditions are not expected to be as severe as in 2019-20. AEMO COO Michael Gatt notes that heatwaves and bushfires remain a "prominent risk", while predicted El Nino weather patterns means there is an increased risk of tropical cyclones and flooding.
CORPORATES
AUSTRALIAN ENERGY MARKET OPERATOR LIMITED